Richemont Campus

/

Geneva campus of Haute Horlogerie, Meyrin

Type of project

Industrial and administrative buildings, connected by the basement and the ground floor. Overall, there is:

  • —Building B, including 3 floors and superstructures. An extension will be built in a second phase.
  • —Building A, including 3 floors and superstructures.
  • —Building C, including 5 floors and superstructures.

Technical specifications

  • Long cantilevers, 4 m
  • Long spans, up to 12 m
  • High payloads, up to 800 kg/m2
  • Prestressed structure
  • Piled wall with earth nails
  • Minergie Eco Label
Client
Richemont International SA

Architect
De Planta & Portier

Achievement period
2012 - en cours

diabolo design // website creation