Type of project

Construction of a watch manufacture building at Plan-les-Ouates / Geneva

Industrial and administrative building

Technical specifications

  • Horizontal structure elements in reinforced concrete, with spun concrete and steel pillars in the facade.
  • Steel and glass bridge.
  • Approximately 130,000 m3 SIA
Client
Patek Philippe

Architect
S + M Architectes SA

Achievement period
1993 - 1996