Industrial and administrative building
Type of project
Construction of a watch manufacture building at Plan-les-Ouates / Geneva
Industrial and administrative building
Technical specifications
- Horizontal structure elements in reinforced concrete, with spun concrete and steel pillars in the facade.
- Steel and glass bridge.
- Approximately 130,000 m3 SIA
Client
Patek Philippe
Architect
S + M Architectes SA
Achievement period
1993 - 1996