Agenhor

/

Watchmaking building AGENHOR in Meyrin

Type of project

Office and manufacture building in Meyrin, with one level above the ground floor, and one basement level, ready for any future development.

Technical specifications

Plot area: 3,000 m2

SIA volume: 4,500 m3

The building is founded on line footings connected to a concrete pavement in the lower area.

The roof slab serves as retention area for stormwater.

Client
C. et J.-M. Wiederrecht

Architect
BCR Beyeler-Colaço-Roesti

Achievement period
2008 - 2009