Project «ELENA» – in Meyrin
Type of project
Extension of Building 193, consisting of a 600-m2 steel frame building designed to accommodate generators and detectors for the ELENA Project
All outdoor works are included in the assignment
Technical specifications
- 600-m2 steel frame building
- 10-ton bridge crane
- Foundation underpinning work next to the cutoff wall connected to building 193
- Outdoor works on 1,000 m2, including landscaping, revegetation, car park, access road, wastewater and stormwater networks
Client
CERN
Achievement period
2013 - 2014