CEVA Railway Link, package 6

/

Description of services

Engineer's environmental coordinator for CEVA package 6 (railway link Cornavin - Eaux-Vives - Annemasse)

During construction, the environment areas considered are:

  • On-site solid waste management
  • On-site water management
  • On-site soil, air and noise protection
  • Monitoring of demolition works
  • Tracking of excavated materials and compliance checks on disposal procedures.
Client
Canton Geneva / SBB

Achievement period
2011 – ongoing

diabolo design // website creation